While the Indian Railways, Army and Brihanmumbai Municipal Corporation (BMC) are struggling to acquire 180 sq metres of land for constructing a foot overbridge (FOB) at Currey Road station, there is a bigger safety problem that the Central Railway (CR) is grappling with. The problem came to notice on Monday when Union Railway Minister Piyush Goyal visited Currey Road station to inspect the work on the FOB.
Over the past few months, the CR authorities began constructing the second FOB at Currey Road station and in the past few weeks they have built the staircases on both sides of the platform. The work on the elevated portion of the FOB that extends on the east till the platform, too has been started. They painted this structure in silver, but put granite tiles on the stairs just a couple of days before Goyal was to visit the station.
There are two landings — one towards Dadar and the other towards Chhatrapati Shivaji Maharaj Terminus — where the staircases are there. However, there is an issue with the landing of the staircase towards the CSMT-end as they end straight on to a cemented and tiled seat. This has a metal pole holding the roof and people often sit there while waiting for the train. The gap is barely of 3-4 feet, which is insufficient considering the huge number of commuters.
“We have examined this and it is an additional landing. We are finding out solutions keeping in view the requirement of cover over platforms for the passengers,” said SK Jain, Divisional Railway Manager (Mumbai), Central Railway.
Railway Minister Piyush Goyal has stressed on ensuring safety of commuters at railway stations and its premises. Even the multi-disciplinary audit team in its report has stated the need to remove all obstructions near the landing of FOBs across the suburban stations in Mumbai.